Pre-engineered metal buildings refer to those whose main structure is made of metal materials. The commonly used metal material is steel, as it has strong rigidity, certain ductility, and is environmentally friendly, making it a cost-effective choice. EIHE Steel Structure is a steel structure building company integrating design, production and construction, with over 20 years of industry experience. Welcome to contact us.
Pre-engineered metal buildings represent a new architectural form in the modern era. The core of this form is to first fabricate the designed building components in factories and then transport them to the construction site for installation. The connection methods of the components include bolt connection and welding. Our steel structure factory specializes in the design and manufacture of steel structure components, enabling batch production of components. Under the premise of ensuring quality, it can also shorten the overall construction period of buildings. Metal buildings have a wide range of applications. In the early days, they were used in the military and agricultural fields. With the development of The Times, it is now widely applied in industrial fields, commercial fields, logistics fields, cultural and sports fields, agricultural fields, public building fields, and so on. Prefabricated metal buildings are particularly suitable for enterprises and individuals who need large Spaces, rapid construction, and high quality requirements.
Product advantages
The comprehensive cost is low. Compared with traditional concrete structures, Pre-engineered metal buildings require less labor and save labor costs. The prefabricated production mode can also accelerate the construction progress and save time costs. The maintenance cost of the main structure is low.
It has a fast construction speed and can shorten the payback period of investment
Factory production avoids the problem of inconsistent quality and specifications in on-site production at construction sites.
Flexible space, large-span design, and the interior space can be freely divided
It is highly durable, with high steel strength, good seismic and wind resistance performance, and is long-lasting.
Environmentally friendly and green, the materials are recyclable, and the construction process causes little pollution.
Product processing steps
Before Pre-engineered metal building construction begins, our design team will first communicate with the client about the building's requirements, then design the drawings and 3D models based on the requirements, and precisely calculate the connection distances between each component, etc.
After confirming the drawings, the components will be processed. First, use a flame cutting machine and a laser cutting machine to cut the steel plate into the required parts.
The second step is to drill holes in the steel plate, with the aim of reserving positions for the bolts.
The third step is to assemble and weld the steel plates. Use an automatic welding machine to weld the steel plates to form H-shaped steel.
The fourth step is correction and cleaning. Use a hydraulic straightening machine to correct the assembled components to prevent deformation of the steel. Then it is sent into the shot blasting rust removal machine for surface treatment. Remove the rust on the surface of the steel to facilitate better adhesion of the paint to the steel surface.
Product case
The Steel Structure factory building of FAW Jiefang Qingdao Base, constructed by EIHE Steel Structure, has a total construction area of over 470,000 square meters, covering core production units such as stamping, welding, painting, assembly, vehicle frame joint workshop and new energy power battery factory building. The new battery factory for new energy vehicles to be built in 2024 adopts a portal frame structure, with a construction area of 4,559 square meters and a height of 12.4 meters. It is used for the integrated production of battery systems for new energy vehicle models. The maximum span of the frame joint workshop reaches 30 meters, meeting the welding and assembly requirements of large frame components. The factory layout is optimized through 3D simulation technology to achieve the shortest logistics route and balanced capacity distribution. For instance, the stamping workshop and the welding workshop are directly connected by an aerial corridor, reducing the turnover time of components.