The Customized steel structure workshop construction of EIHE Steel Structure is a steel structure industrial building that is designed and constructed according to different industries. We are a Chinese manufacturer and supplier of steel structure workshops. Our customized services cover almost the entire industry. Welcome to consult us.
Customized steel structure workshop construction, in simple terms, is a steel structure industrial factory building that is designed and constructed one-on-one based on your production process, equipment layout, site conditions and budget requirements. It is different from the "finished product" buildings purchased from standard catalogues, but rather a "tailor-made" industrial building solution. If you are looking for a professional supplier and manufacturer of steel structure workshop buildings, please feel free to contact us.
Components of the product
● Main structure
A framework composed of H-shaped steel columns and steel beams, which forms the "skeleton" of the building and bears all the loads.
● Secondary structure
Includes purlins, support systems and tie rods, which are used to ensure overall stability and resist wind loads and seismic forces.
● Enclosure system
Roof panels and wall panels, insulation and heat insulation layer, doors and windows, which determine the insulation, sound insulation and aesthetics of the Customized steel structure workshop construction.
● Auxiliary systems
Truck loading system, ventilation and lighting system, fire protection pipelines and downspouts, etc.
Product case
Greenwear Clothing Design and Manufacturing Factory
● Construction Party: Fabrication and Installation by QINGDAO EIHE STEEL STRUCTURE GROUP CO., LTD.
● Investment Party: Led by GREENWEAR Company. This company specializes in the design, research and manufacturing of mid-to-high-end clothing.
● Project Location: Located in the startup area of Mohammed VI Djenne-Djamel Technology City in Morocco, specifically Block 17.
1. How long does it take from the design stage to the completion of the Customized steel structure workshop construction?
The total duration is usually between 2.5 and 4 months.
2. Can the interior of the workshop be completely free of columns?
A lattice steel beam or a grid structure can be used, but the steel usage will increase.
3. Is the post-installation maintenance troublesome?
No, it isn't. Every 3 to 5 years, it is necessary to check for loose bolts, peeling paint and accumulated dust on the roof. In coastal areas, it is recommended to conduct an inspection of the anti-corrosion layer every 2 years.