It is a large single-story steel-structure workshop connected directly to a three-story office building next to it. The workshop is like the train body, and the office is like the train engine (the locomotive head). Connected together as one, it is called a "locomotive-style" building.
In one sentence: The client wants to save money and save land.
After a workshop is built, you still need space for offices, staff breaks, and meeting visitors. If you build a separate office building, it takes up more land. You also have to keep a required fire safety distance between the two buildings. That means separate foundations, separate walls, and separate roads—which costs a lot of money. So a smart solution was created: attach the office building directly to the gable wall (end wall) of the workshop. They share one wall, but have separate uses and separate emergency exits. You get everything you need, while cutting out extra costs.
● Large Spans—With a good design, single spans of 20 to 30 meters are easy to build. Fewer columns inside mean more open space to place machinery and equipment;
● Steel Savings—Using long spans with a light steel roof reduces the steel needed for beams and columns. For the same budget, steel saves much more money than concrete;
● Foundation Savings—With fewer columns and a lighter building weight, foundation costs are much lower;
● Fast Construction—Parts are made in the factory and simply assembled on-site. There is no rebar tying, formwork, or concrete curing time, making it much faster than cast-in-place concrete.
Therefore, for the workshop, steel structure is recognized by everyone as the best solution.
The difficult decision is the "locomotive head" (the office building). This building usually has these features: few floors (mostly 3 stories), short spans (usually 7 to 8 meters), no middle columns (single span), and light floor loads (used for office work).
If this were a standalone building, a concrete frame would be an obvious, easy choice. But because it is attached to a steel workshop, people often hesitate: Should we use a steel frame to match the workshop, or stick with traditional concrete? Both choices have good reasons. Let's look at each one clearly:
Advantages (Pros)
● Fast Construction: Beams and columns are pre-made in the factory and assembled on-site like Lego blocks. A 3-story building can often be finished in about one month;
● Lightweight: For the same 3 floors, a steel frame is nearly 50% lighter than concrete. Lower column-base load means you can save money on foundations;
● Good Earthquake Performance: Steel is flexible and tough. During an earthquake, it bends instead of breaking. In high-earthquake zones, this is a real life-saving advantage;
● Matches the Workshop: The same construction team and the same system work on both the workshop and the office, making coordination smooth and simple.
Disadvantages (Cons)
● Higher Material Cost: Steel as a raw material is more expensive;
● Fireproof Coating Is Expensive: Steel loses strength in fire, so all beams and columns need fireproof coating. Concrete does not need this extra cost at all;
● Rust Risk: It needs good anti-rust paint and regular maintenance over time;
● Higher Skill Required: Welding, bolts, and installation precision require a skilled construction team.
Advantages (Pros)
● Lower Cost: Reinforced concrete materials are cheaper than steel;
● Fire-Resistant: Concrete resists fire naturally, saving 100% of the fireproof coating cost;
● Strong and Durable: It can last for decades with very little maintenance;
● Easy to Build: Setting up formwork, tying rebar, and pouring concrete are standard tasks. Most construction teams can do it, so they are easy to find and negotiate with.
Disadvantages (Cons)
● Heavy Weight: High column-base load requires a larger foundation area under the same ground conditions;
● Longer Construction Time: Setting up molds, pouring concrete, and waiting for it to cure take time and cannot be rushed;
● Weaker in Earthquakes: Concrete is heavy and stiff. During an earthquake, it is more rigid and can crack easily, lacking the flexibility of steel;
● Two Separate Teams: One team does steel and another does concrete. Managing two different teams and systems adds coordination trouble.
Construction costs change depending on the region and market conditions, so prices are not the same everywhere. But here is a general price range for reference (based on current market estimates; final costs depend on local quotes):
| Concrete Frame Office | Steel Frame Office (with fireproof coating) |
| ≈ 1,400 RMB / m² | ≈ 1,600 RMB / m² |
Under normal conditions, concrete is cheaper. That is why many people prefer concrete—after all, saving money is usually the top priority.
If the following conditions happen together, you should strongly consider using a steel structure directly:
● High Earthquake Zone (such as Seismic Fortification Intensity of Degree 8 or higher);
● Active Fault Line Within 10 km of the Site: You must calculate extra earthquake force ("near-field effect"). Because heavier buildings receive much stronger earthquake forces, this makes concrete design calculations very difficult and costly. Steel is lighter, so it is much less affected.