EIHE Steel Structure is a Chinese supplier and manufacturer of steel structure sports buildings. Through large-span design and high-standard production, we have provided customized solutions for customers in many countries and regions around the world. If you have any requirements or questions related to Roller skating rink steel construction, please feel free to contact us.
A Roller skating rink steel construction refers to an indoor venue specifically designed for roller skating, with the steel structure serving as the main load-bearing system. The steel structure venue buildings of EIHE Steel Structure can leverage the advantages of high strength, high toughness, and light weight of steel, making them particularly suitable for roller skating rinks, which require large spaces and column-free areas. As a high-quality supplier and manufacturer in China, we can provide you with
Parameter (Specification)
Product name
Roller skating rink steel construction
Brand
EIHE Steel Structure
Origin
Qingdao, Shandong, China
Building height
8-15m
Indoor clear height
≥7m
Common span
30-70m
Column spacing
6-9m
Steel usage
30~80 kg/m²
Steel yield strength
≥355MPa
Seismic fortification intensity
7 degrees
Roof slope
5%-10%
Design service life
50 years
Anti-slip coefficient
Dry state ≥ 0.6, Wet state ≥ 0.8
Surface material
Special roller skating acrylic (2 - 3mm) or polyurethane self-leveling (3 - 5mm)
After all the components of the Roller skating rink steel construction building have been produced, we can deliver them to overseas countries and regions. Our delivery methods include the following:
Ocean Shipping
Bulk Carrier: For large-scale venue construction projects, if the steel beams and steel columns exceed the length of an ocean shipping container and cannot be cut, we will ship them in bulk form.
Container ships for sea transportation: Container ships are suitable for most of the dimensions of steel structure components. This is one of the most economical and stable shipping methods, and it is also the preferred choice for customers in many countries and regions.
Railway transportation
FAQ
1.What material is a roller rink made of?
Apply water-based or oil-based specialized roller skating coating on the sealed and cured or self-leveling cement base layer.
2.How to build a Roller skating rink steel construction
When the components are manufactured in our factory and then transported to the project site, they will be lifted and installed. This includes the following steps
● Preparation → Inspect the concrete foundation and the position of the anchor bolts.
● Installation of steel columns → Install one by one, temporarily fix, and adjust the verticality.
● Installation of steel beams → Assemble the entire or segmented beam sections on the ground and then connect them at heights to form a diagonal truss.
● Installation of supports → Immediately install column spacers, roof horizontal supports, and tie rods to ensure overall stability.
● Improvement of secondary structures → Install purlins, wall beams, and tie rods, and finally install the enclosure panels.
3. What are the core functions of this type of building?
Steel structure, as a typical representative of large-span space buildings, when applied to the roller skating stadium, can expand the horizontal and vertical spaces of the original roller skating stadium. At the same time, different functional areas such as training area, leisure area, equipment area, rest area, and grandstand can be designed.
4. How long does the construction period of a steel structure roller skating arena typically take?
For a 3,000-square-meter steel structure roller skating arena, the total construction of the structure part takes approximately 1.5 months, and the entire project is completed in about 3 to 4 months. This is 1 to 2 months faster than a similar-sized concrete frame structure.
5. The floor of the roller skating arena needs to have elasticity and shock absorption. How can the steel structure floor achieve this?
If the roller skating arena is located on the second floor, the steel structure floor needs to use a composite floor to ensure its rigidity.
Welcome to our website! For inquiries about steel frame building, steel structure warehouse, school steel building or price list, please leave your email to us and we will be in touch within 24 hours.
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies. Privacy Policy