Steel Container Dormitory is a type of modular collective accommodation unit mainly constructed with standard shipping containers or customized steel modules. The products developed by EIHE Steel Structure (EHSS) are typical applications of Modular Construction in the dormitory sector. As a leading steel structure manufacturer based in Qingdao, we enjoy unique provincial resources and an advantageous geographical location.
Steel Container Dormitory is a high-efficiency civil building that uses containers as its basic modules. EHSS factory, we, make it for many clients who said that our quality is quite high in China.
◆ Main Material
High-strength steel (Q355B)
◆ Combination
✔ Horizontal splicing
✔ vertical stacking
◆ Core Advantages
✔ Rapid deployment
✔ High durability
✔ Flexibility and mobility
✔ Cost-effectiveness
✔ Environmental friendliness
◆ Application Scenarios
✔ Construction camps
✔ Educational facilities
✔ Emergency shelters
✔ On-duty quarters in remote areas
✔ Temporary accommodation in scenic spots
✔ Supporting dormitories for mobile cabin hospitals
✔ etc.
Compared with traditional dormitories
Our products have significant advantages over traditional dormitory buildings.
Dimension
Steel Container Dormitory
Traditional brick concrete/frame dormitory
Construction cycle
1-4 weeks
3-12 months
Mobility
Detachable
Non-removable
Prefabrication rate
90%+
10%–30%
Environmental friendliness
Zero construction waste, recyclable materials
Generate a large amount of construction waste
Cost
Low one-time investment, leasable
High one-time investment, non reusable
Applicable scenarios
Temporary/semi permanent, rapid demand
Permanent fixation, long-term use
Logistics and Delivery
After the components are manufactured, they need to be transported to the construction site via a sophisticated logistics system.
For export projects of Steel Container Dormitory, this involves complex sea-land multimodal transportation.
1. Packaging and Reinforcement
Customize packaging solutions according to module characteristics, such as sealed packaging for moisture protection and filling with anti-collision cushioning materials.
2. Route Planning
Factory – Port – International Transshipment Port – Destination Port
3. On-site Delivery
After the goods arrive at the construction site, they shall be stacked orderly in the designated area to prepare for the subsequent on-site assembly.
Welcome to our website! For inquiries about steel frame building, steel structure warehouse, school steel building or price list, please leave your email to us and we will be in touch within 24 hours.
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies. Privacy Policy