As a manufacturer and supplier of high-quality Prefab Steel Structure Warehouse Building in China, EIHE Steel Structure has more than twenty years of relevant experience. Nowadays, steel structures, with their outstanding material strength and spacious spatial layout, have become one of the best warehouse building liberation solutions in the world.
Prefab Steel Structure Warehouse Building refer to those that take advantage of the production lines of steel structure factories. After the project design is completed, all components can be processed and manufactured in our factory. The main feature of this type of building is that the main building material is steel, and the main structure is composed of steel structures. The components are closely connected, which can achieve the maximum uniform force distribution. Effectively prevent natural disasters such as strong winds and earthquakes.
It is an efficient, economical and green architectural form representing the direction of industrialized construction. With its outstanding large space and high completion speed, it has already been applied in industrial warehousing. Commercial buildings have taken root and flourished in fields such as emergency buildings.
Parameter (Specification)
Product name
Prefab Steel Structure Warehouse Building
Brand
EIHE Steel Structure
Origin
Qingdao, Shandong, China
Common structural forms
Portal frame, steel truss
Main structural steel type
H-shaped steel, rectangular steel
Material of wall panels
Rock wool sandwich panel
Maximum span
More than 60 meters
Column spacing
6 to 9 meters
Connection method
High-strength bolts and welding
Roof live load
0.3-0.5 kN/m²
Seismic fortification intensity
7 to 8 degrees
Fire resistance grade
Level 2
Fire resistance grade
Spray painting + fireproof coating
Produce case
The CIMC Cold Chain Industrial Park, constructed by EIHE Steel Structure, is located in the Economic Development Zone of Jiaozhou City. It covers a total area of 97,482 square meters, uses 2,700 tons of steel, and the construction period is 90 days.
Factors influencing the construction period of steel structure warehouses
The construction speed of Prefab Steel Structure Warehouse Building depends on the complexity of the project. The size of the project, local weather conditions, the difficulty of foundation construction, etc.
However, with our factory's prefabricated and assembled construction model, it can be built more than 30% faster than traditional concrete structure buildings.
Welcome to our website! For inquiries about steel frame building, steel structure warehouse, school steel building or price list, please leave your email to us and we will be in touch within 24 hours.
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies. Privacy Policy