Portal Frame Steel Construction refers to standard steel structures. Featuring portal steel frame as the core structure, it resists external loads through bending deformation of steel components, making it ideal for large-span space requirements. This type of product is widely applied to industrial workshops and warehouses. As a leading steel structure supplier in the industry, EIHE Steel Structure (EHSS) boasts abundant manufacturing experience in the industrial sector.
Portal Frame Steel Construction is a steel load-bearing system composed of steel beams, steel columns and rigid joints. It is named portal frame for its door-frame-like appearance.
Meanwhile, thanks to its balanced performance in structural efficiency, economy, functionality, constructability and standardization, it has become the standard structural solution for single-storey industrial buildings. This structure is widely used in the industrial and logistics industries across China and the world.
● Optimal structural efficiency.
Portal Frame Steel Construction adjusts stress according to bending moment changes of component sections, fully exerting the plastic potential of steel and forming a complete lateral restraint system. It is a model of mechanical efficiency.
● Remarkable Cost-effectiveness.
The core indicator of steel structure economy lies in steel consumption. Cost comparison of buildings with different materials and structures depends on foundation cost, construction period, envelope cost and whole life cycle cost.
In comparison, Portal Frame Steel Construction features the lowest steel consumption among large-span steel structure systems.
Compared with concrete frames, it saves 30% of foundation costs and shortens the construction period by 50%. Compared with concrete materials, it also boasts core advantages of steel structures such as recyclability and convenient expansion, which reduces the comprehensive cost of our products.
● It meets the core functional requirements of industrial buildings.
▷ Available with daylight strips, roof ventilators and air towers
Our Portal Frame Steel Construction can meet all the above requirements.
● Fast construction speed and stable construction quality.
Our products adopt a fast assembly solution of factory prefabrication plus on-site installation. Standardized factory prefabrication ensures stable component quality. With less on-site construction work, skilled installers can guarantee consistent installation quality.
Construction Stage
Foundation Construction
Main Structure Construction
Envelope Construction
Total Construction Period
Portal Frame
7-14 days
10-20 days
10-15 days
30-50 days
Concrete Frame
14-28 days
40-60 days
20-30 days
80-120 days
Meanwhile, Portal Frame Steel Construction features a short construction period, with the entire project able to be completed within three months.
In summary, our products achieve a more balanced performance in mechanics, economy, functionality and construction compared with other steel structures. Meanwhile, they possess multi-dimensional replacement advantages over traditional concrete, brick-concrete and other structural systems.
Customization & Process Flow
Typical buildings adopting portal frame steel structures are not limited to industrial buildings, but also widely applied in commercial, agricultural, sports and public buildings.
E.g:
✔ Production workshops and assembly plants
✔ Warehouses and distribution centers
✔ Supermarkets, hypermarkets and exhibition halls
✔ Agricultural machinery depots, breeding farms and grain warehouses
✔ Indoor gymnasiums and sports centers
✔ Community centers and school auditoriums
We are confident to manufacture all types of portal frame steel construction products for you. We can supply standard steel structure products as well as professional customized services to meet your diverse requirements. This is attributed to our Grade 1 design qualification and Grade 1 construction qualification.
In the production process of Portal Frame Steel Construction, construction and installation is an optional service provided by us. The entire construction process is mainly divided into seven procedures.