Steel Frame Building
Steel Structure Waste Incineration Power Factory Construction
  • Steel Structure Waste Incineration Power Factory ConstructionSteel Structure Waste Incineration Power Factory Construction
  • Steel Structure Waste Incineration Power Factory ConstructionSteel Structure Waste Incineration Power Factory Construction
  • Steel Structure Waste Incineration Power Factory ConstructionSteel Structure Waste Incineration Power Factory Construction
  • Steel Structure Waste Incineration Power Factory ConstructionSteel Structure Waste Incineration Power Factory Construction

Steel Structure Waste Incineration Power Factory Construction

The Steel structure waste incineration power factory construction is an industrial building that requires the combination of mechanical technology and steel structure technology. As a Chinese steel structure supplier and manufacturer, EIHE Steel Structure is able to provide global clients with power plant buildings that are of high precision, spacious and durable.

The Steel structure waste incineration power factory construction is constructed with steel structure as the load-bearing structure, and is a comprehensive industrial building complex specifically used for waste incineration and power generation. It is a highly precise structural system that integrates large-span spaces, load-bearing equipment, and high-temperature resistance. Our factory has rich experience in industrial building projects and can provide full-process services including design, production, and installation. If you are looking for a reliable steel structure supplier and manufacturer, please feel free to contact us. 


Product design details

● Strong corrosion resistance design

During the incineration process of garbage, ammonia gas and condensate are released, which are highly corrosive. Therefore, the structural components of theSteel structure waste incineration power factory construction need to be coated with heavy-duty anti-corrosion coatings, and the coating system must reach the marine industrial environment grade.

● Temperature stress mitigation

When the incineration boiler is operating, the temperature between the boilers usually reaches above 50 degrees. It is necessary to design reasonable temperature expansion joints and use sliding bearings to release stress.

Parameter (Specification)

Product name

Steel structure waste incineration power factory construction

Brand

EIHE Steel Structure

Origin

Qingdao, Shandong, China

Garbage pit span

28 - 36 meters

Height of incineration boiler room

35 - 50 meters

Column spacing of main plant

6 - 12 meters

Span of turbine room

12 - 18 meters

Fire resistance limit requirements

Steel columns for garbage pits and boiler rooms: 3.0 hours

Coating thickness

≥300μm

Construction method

Screw connection

Steel columns/steel beams

H-shaped steel

Negative pressure value inside the garbage pit

50 Pa ~ -100 Pa


Product Packaging and Shipping

● Packaging

After the components of the Steel structure waste incineration power factory construction are completed, we will stack the components one by one into the prefabricated packaging frame. This frame structure is stable and has high strength, which can prevent the components from falling out during transportation.

 

Packaging

 

● Delivery

We offer all kinds of transportation methods for goods, including railway transportation, ocean transportation and air transportation. Our team will provide you with the most suitable transportation method that suits your needs.

 

Delivery

FAQ

1. What are the advantages of a steel structure waste incineration power plant?

● It can accommodate heavy-duty cranes

● Factory prefabrication, with assembly line processing, shortens the construction period

● Flexible renovation capabilities

 

2. Can regular anti-corrosion paint be used?

No, because when garbage is incinerated, it will produce ammonia gas, which is corrosive. Therefore, a thicker anti-corrosion coating needs to be applied.

 

3. Should the boiler equipment be installed first or the steel structure first?

We usually install the steel columns of the steel structure first, then install the boiler equipment, and finally install the steel beams and panels.

Send Inquiry
Contact Info
Welcome to our website! For inquiries about steel frame building, steel structure warehouse, school steel building or price list, please leave your email to us and we will be in touch within 24 hours.
X
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies. Privacy Policy
RejectAccept