The green prefabricated terminal building construction, as a new type of architectural form, is increasingly recognized worldwide. This is because it not only has low costs, but also can be put into use quickly. What's more, the building materials it uses do not cause harm to the natural environment. With the assembly-based industrial manufacturing method, EIHE Steel Structure has become a high-quality steel structure building manufacturer in China.
The green prefabricated terminal building architecture has overturned the traditional construction method of terminal buildings. It adopts a smaller cross-section and higher-strength steel structure as the overall framework of the building. It bears all the forces, including shear forces, loads, etc.
Prefabricated
Component prefabrication: The beams, columns, floor slabs, curtain wall units, and even some functional modules (such as bathrooms, commercial unit modules) are all produced in the factory in advance.
On-site assembly: These prefabricated components are transported to the construction site and assembled and fixed through reliable connections like building with building blocks. green
Energy conservation: The prefabricated roof can conveniently integrate solar photovoltaic panels or thermal systems to supply power or provide hot water for the terminal building.
Material conservation: A large amount of recyclable green building materials are used, such as high-strength steel, recycled concrete, and environmentally friendly insulation materials.
Safety and health: Through precise assembly, good sound insulation, constant temperature and humidity effects are ensured, creating a quiet waiting environment for passengers.
Product case
Jinan Yaoqiang Airport
The second-phase expansion project of Jinan Yaoqiang Airport, constructed by EIHE Steel Structure, is located in the northeastern part of Yaoqiang Town, Liucheng District, Jinan City, Shandong Province. It is about 30 kilometers away from the city center. Currently, it is a 4E-class civil international airport. The project includes the construction of a new 600,000-square-meter terminal building, a 380,000-square-meter integrated transportation center, and the flight area, etc. After the completion of the project, Jinan Airport will have a terminal building of nearly 800,000 square meters, with its flight level raised to the highest 4F level. It is expected to meet the demand of 55 million passengers and 520,000 tons of cargo and mail per year.